| Alleys |
|
| |
Alleys |
36 Alley segments with PCI of 55 or less |
$3,715,160 |
| |
|
|
|
| Street Rehabilitation - Collectors |
|
| |
Collectors |
7 Collectors - Terrace, Dumont, Lookout, Melrose, S. Grove, Bowser, Old Campbell (asphalt) |
$5,631,890 |
| |
|
|
|
| Street Rehabilitation - Residential |
|
| |
Residential Streets |
15 Residential Streets - Asphalt on 300 Pittman, Wista Vista & Huffhines |
$5,640,075 |
| |
|
|
|
| Street Capacity |
|
| |
City Participation |
Galatyn Overpass Extension ($525,000) and developer participation ($262,500) |
$787,500 |
| |
UTD Roadways |
Construct roadway connections on UTD Campus |
$2,836,000 |
| |
|
|
|
| Intersection Improvements |
|
| |
Spring Valley Rd. / Weatherred Dr. - Dallas County |
Construct dual left-turn bays for Weatherred Dr. & right turn only lanes for both streets |
$568,000 |
| |
Collin County RTR Intersections |
Construct RTLs at Jupiter/Renner, Renner/SH 190, Alma/Renner, Jupiter/SH190 |
$315,000 |
| |
|
|
|
| Traffic Control Devices |
|
| |
Communications & Operations Upgrade |
Replace Traffic Signal Communications System |
$1,439,000 |
| |
Traffic Signal Rebuilds Phase I |
Reconstruct older signals to restore reliable operations at 14 of 57 required locations |
$2,060,625 |
| |
Signal Cabinet Upgrade Phase I |
Replace old TS1 cabinets with TS2 cabinets |
$378,000 |
| |
Signal Battery Backup Units Phase I |
Install battery backup units for signals to operate during power outages |
$141,750 |
| |
|
|
|
| Flood Prevention |
|
| |
Laurel Ln. - St. Lukes Dr. to Waterview Dr. |
Construct drainage & repave Laurel Ln. from St. Lukes Dr. to Waterview Dr. |
$399,000 |
| |
|
|
|
| Erosion |
|
| |
1709 Timberway Dr. Erosion Repair |
Construct gabion wall channel protection |
$136,500 |
| |
1502 Braeburn Dr. Erosion Repair |
Construct gabion wall channel protection and remove existing rip rap |
$283,500 |
| |
|
|
|
| Bridges / Culverts |
|
| |
Phillips Bridge at Floyd Branch |
Remove and replace existing culvert with a bridge |
$378,000 |
| |
|
|
|
| |
|
TOTAL STREETS & DRAINAGE
|
$24,710,000
|