1. Custer Rd. between Hanbee St. and Daniel St.
  • Project Description: Street and alley paving, drainage, and utility rehabilitation
  • Traffic Impact: This project includes several alley reconstructions. The inside northbound lane of Custer Parkway between Hanbee Street and Daniel Street could be temporarily closed to traffic from 9:00 AM to 3:30 PM or overnight as needed for concrete curing (Part of 2010 Alley Rehabilitation Project).
  • Estimated Completion: Late March
2. Coit Rd. from Chippewa Dr. to Apache Dr.
  • Project Description: New Pole Installation
  • Traffic Impact: The right northbound lane of Coit Road between Chippewa Drive and Apache Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid March
3. Greenville Ave. – Tyler St. – Dorothy Dr. – Grove Rd. – Plano Rd. – Arapaho Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: 1) The right lane Greenville Avenue north of Main Street may be closed to through traffic from 9:00 AM to 3:30 PM. 2) Parking may be restricted on the west side of Dorothy Drive between Tyler Street and Main Street from 9:00 AM to 3:30 PM. 3) The right lane for westbound Arapaho Road at Plano Road may be closed to through traffic from 9:00 AM to 3:30 PM. 4) The bike lane on Grove road from Main Street to Arapaho may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
4. Renner Rd., Point North Pkwy., and Renner Trail
  • Project Description: Pole Replacement
  • Traffic Impact: 1) The right lane of westbound Renner Road between Synergy Park Boulevard and Collins Boulevard may be closed to through traffic from 9:00 AM to 3:30 PM. 2) Renner Trail between University Trail and Valley Ridge Drive may be closed from 9:00 AM to 3:30 PM. 3) Point North Parkway between Synergy Park Boulevard and Tam O'Shanter Lane may be reduced to one travel lane between 9:00 AM and 3:30 PM. Flaggers will be present to direct traffic.
  • Estimated Completion: Late March
5. Greenville Ave. between Apollo Rd. and Arapaho Rd.
  • Project Description: Sidewalk Construction
  • Traffic Impact: The right northbound lane of Greenville Avenue may be closed to traffic between Apollo Road and Arapaho Road. Closure times are restricted to working hours.
  • Estimated Completion: Late March
6. Renner Rd. from Foxboro Dr. to Marathon Ave.
  • Project Description: Pole Replacement
  • Traffic Impact: The right lane westbound Renner Road from Foxboro Drive to Marathon Avenue may be closed from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid March
7. Plano Rd. from Broadmoor Dr. to Renner Rd.
  • Project Description: Pole Replacement
  • Traffic Impact: The right lane of northbound Plano Road from Broadmoor Drive to Renner Road may be closed to through traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid March
8. Custer Road from Arapaho to Rd. to Beverly Dr.
  • Project Description: Pole Replacement
  • Traffic Impact: The right lane for southbound Custer Road from Arapaho Rd. and Beverley Drive may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Mid March
9. Yale Blvd. from Arapaho Rd. to Sara Ln.
  • Project Description: Screening Wall Extension
  • Traffic Impact: The right lane for westbound Arapaho Road at Yale Boulevard may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
10. Arapaho Rd. from Plano Rd to Presidential Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for westbound Arapaho Road between Plano Road and Presidential Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
11. Arapaho Rd. between Exchange Dr. and International Pkwy.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of westbound Arapaho Road between Exchange Drive and International Parkway may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid March
12. Synergy Park Blvd. between Renner Rd. and Facilities Way
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of westbound Synergy Park Boulevard between Renner Rd and Facilities Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Early April
13. Campbell Rd. at Floyd Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: 1) The right turn lane for eastbound Campbell Road at Floyd Road may be closed to through traffic between 9:00 AM and 3:30 PM. 2) The inside left turn lane for southbound Floyd Road at Campbell Road may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
14. Belt Line Rd. between Trellis Pl. and Jupiter Rd.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of eastbound Belt Line Road between Trellis Drive and Jupiter Road may be closed to traffic from 9:00 AM to 3:30 PM. Work will extend into the City of Garland.
  • Estimated Completion: Late April
15. Glenville Dr. between American Pkwy. and Columbia Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of southbound Glenville Dr. between American Parkway and Columbia Drive may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Early April
16. Collins Blvd. between International Pkwy. and Glenville Ave.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of eastbound Collins Boulevard may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
17. Glenville Ave. between Kas Dr. and Digital Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of northbound Glenville Avenue between Kas Drive and Digital Drive may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
18. Arapaho Rd. from Jupiter Rd. to Glenville Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of westbound Arapaho Road between Jupiter Road and Glenville Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
19. Interurban Street between Arapaho Rd. and Rayflex Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The parking lane on southbound Interurban Street between Arapaho Rd. and Rayflex Dr. may be closed to traffic from 9:00 AM to 3:30 PM. This may result in reduced lane width.
  • Estimated Completion: Late March
20. Custer Rd. between Tyler St. and Westwood Dr.
  • Project Description: Cable Installation
  • Traffic Impact: The right lane for northbound Custer Rd. may be shifted across the center line from 9:00 AM and 3:30 PM. Signs and delineators will be present to direct traffic.
  • Estimated Completion: Late March
21. Grove Rd. between Arapaho Rd. and Apollo Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The Bike Lane for southbound Grove Road between Arapaho Road and Apollo Road may be closed to traffic. Signs will be present directing bikes into the travel lane and notifying drivers bicycles may be in the travel lane.
  • Estimated Completion: Late March
22. Renner Rd. between North Star Rd. and Telecom Pkwy.
  • Project Description: Cable Installation
  • Traffic Impact: The right lane of westbound Renner Rd. between North Star Road and Telecom Parkway may be closed to traffic between 9:00 AM and 3:30 PM.
  • Estimated Completion: Mid April
23. Campbell Rd. between Greenville Ave. and Glenville Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for east and westbound Campbell Road may be closed to traffic in both directions between Greenville Avenue and Glenville Drive netween the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
24. Greenville Ave from Maple St. to Huffhines St.
  • Project Description: Sidewalk Construction
  • Traffic Impact: The right northbound lane of Greenville Avenue may be closed to traffic between Maple Street and Huffhines Street. Closure times are restricted to working hours.
  • Estimated Completion: Early April
25. Renner Rd. at Shiloh Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for eastbound Renner Road at Shiloh Road may be closed to traffic between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
26. Richardson Dr. at Melrose Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound Richardson Drive at Melrose Drive may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Early April
27. Audelia Rd. at Centennial Blvd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for southbound Audelia Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
28. Shiloh Rd. at Renner Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound Shiloh Road at Renner may be closed to traffic between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
29. Waterview Pkwy. between Synergy Park Blvd. and Renner Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound and southbound Waterview Parkway between Renner Road and Synergy Park Boulevard may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
30. Spring Valley Rd. between Waterview Dr. and Weatherred Dr.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of westbound Spring Valley Road between Waterview Dr. and Weatherred Dr. may be closed to traffic from 9:00 AM and 3:30 PM. For utility pole replacement.
  • Estimated Completion: Late March
31. West Shore Dr. between Arapaho Rd. and Wisteria Way
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The width of West Shore Drive may be reduced and northbound traffic may have to cross the roadway center line. Cones will be present to delineate the travel lanes. Flaggers will be present to direct traffic.
  • Estimated Completion: Late March
32. Spring Valley Rd. between Waterfall Way and Central Expressway
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for eastbound Spring Valley Rd. between Waterfall Way and Central Expressway may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
33. Greenville Ave between Alma Rd. and Campbell Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound south Greenville Avenue between Alma Rd. and Campbell Rd. may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
34. Greenville Ave. between Campbell Rd. and Alma Rd.
  • Project Description: Pole Replacement
  • Traffic Impact: The right lane for southbound Greenville Avenue between Campbell Road and Alma Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
35. Renner Rd. at N. Central Expy.
  • Project Description: Utility Installation
  • Traffic Impact: The right lane for eastbound Renner Road at North Central Expressway may be closed between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Mid April
36. Glenville Dr. between Serenade Ln. and Windsong Tr.
  • Project Description: Pole Replacement
  • Traffic Impact: The right lane for southbound Glenville Drive between Serenade Lane and Mackie Drive may be closed between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late April
37. Terrace Dr. between La Salle Dr. and Greenville Ave.
  • Project Description: Pole Replacement
  • Traffic Impact: Travel width may be reduced on Terrace Drive between La Salle Drive and Greenville Avenue. Flaggers will be present to direct traffic.
  • Estimated Completion: Late April
38. Grove Rd. between Centennial Blvd. and Summit Dr.
  • Project Description: Pole Replacement
  • Traffic Impact: Northbound and southbound travel lanes may be reduced in width on Grove Road at Centennial Boulevard. Work may take place between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late April
39. Dorothy Dr. between Main St. and Polk St.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The roadway width of Dorothy Drive may be reduced between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
40. Polk St. between Lois Ln. and Dorothy Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The roadway width for Polk Street between Lois Lane and Dorothy Drive may be reduced between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
41. Routh Creek Pkwy. between Glenville Dr. and Renner Rd.
  • Project Description: Sidewalk Construction
  • Traffic Impact: The right lane for northbound Routh Creek Parkway may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late April
42. Arapaho Rd. between West Shore Dr. and Floyd Rd.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of Arapaho Rd between West Shore Drive and Floyd Road may be closed to traffic between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Late April
43. Spring Valley Rd. between Business Pkwy. and Sherman St.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for westbound Spring Valley Road between Business Parkway and Sherman Street may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
44. Sherman St. at Spring Valley Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for southbound Sherman Street at Spring Valley Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid March
45. Greenville Ave. between Jackson St. and Main St.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound and southbound Greenville Avenue between Jackson Street and Main Street may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Early April
46. Shiloh Rd. at Breckinridge Blvd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for southbound Shiloh Road at Breckinridge Blvd may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Mid April
47. Polk St. between Central Expy. and Interurban St.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of eastbound Polk Street between Central Expressway and Interurban Street may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late March
48. Renner Rd. between Telecom Pkwy. and Spectrum Blvd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of westbound Renner Rd. between Telecom Parkway and Spectrum Blvd. may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
49. Spectrum Blvd. between Renner Rd. and Matrix Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: Spectrum Blvd. may be reduced in width between Renner Rd. and Matrix Drive. Flaggers will be present to direct traffic as needed.
  • Estimated Completion: Late March
50. Campbell Rd. between Custer Rd. and Canyon Creek Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of westbound Campbell Road between Custer Road and Canyon Creek Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late April
51. Campbell Rd. from Greenville Ave. to Jupiter Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for westbound Campbell Road between Jupiter Road and Greenville Avenue may be closed to traffic from 9:00 AM and 3:30 PM
  • Estimated Completion: Late March
52. Jupiter Rd. from Campbell Rd. to Lookout Dr.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for southbound Jupiter Road between lookout Drive and Campbell Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late March
53. Belt Line Rd. at Jupiter Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: 1) The right lane for westbound Belt Line Road at Jupiter Road may be closed to traffic from 9:00 AM to 3:30 PM. 2) The right lane for southbound Jupiter Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Early April
54. Waterview Pkwy. between Frankford Rd. and Synergy Park Blvd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of southbound Waterview Parkway between Frankford Road and Synergy Park Boulevard may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late April
55. Jupiter Rd between Castlerock Ln. and Collins Blvd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for northbound Jupiter Road between Castlerock Lane and Collins Boulevard may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late April
56. Renner Rd. between Custer Pkwy. and Orchard Ridge Ln.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane for eastbound and westbound Renner Road between Custer Parkway and Orchard Ridge Lane may be closed to traffic between the hours of 9:00 AM and 3:30 PM.
  • Estimated Completion: Mid April
57. Belt Line Rd. between Glenville Dr. and Bowser Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The right lane of westbound Belt Line Road between Glenville Drive and Bowser Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late April
58. Renner Rd. between Custer Pkwy. and Collins Blvd.
  • Project Description: Median Improvements
  • Traffic Impact: Work includes redoing the landscaping in the medians to include Texas native plants, new trees, and updated irrigation system.
  • Estimated Completion: Late April
59. Arapaho Rd. between Grant Dr. and Plano Rd.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of westbound and eastbound Arapaho Road between Plano Road and Bridle Road may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Early May
60. Bowser Rd. between Arapaho Rd. to Alpha Dr.
  • Project Description: Utility Work
  • Traffic Impact: The right lane of southbound Bowser Road between Arapaho Road and Alpha Drive may be closed to traffic from 9:00 AM to 3:30 PM.
  • Estimated Completion: Late May
61. Dorothy Dr. between Edgehill Blvd. and Hillside Ave.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The parking area on Dorothy Drive between Edgehill Boulevard and Hillside Avenue may be closed between hours of 9:00 AM and 3:30 PM for installation of new fiber optic.
  • Estimated Completion: Mid May
62. Bynum Dr. between Collins Blvd. and Drexel Dr.
  • Project Description: Utility Work
  • Traffic Impact: The travel lanes for northbound and southbound Bynum Drive between Collins Blvd and Drexel Drive may be reduced in width from 8:30 AM to 3:00 PM.
  • Estimated Completion: Early May
63. Jay Ell Dr. between Campbell Dr. and Alma Rd.
  • Project Description: Fiber Optic Installation
  • Traffic Impact: The parking area on the north side of Jay Ell Drive between Campbell Drive and Alma Road may be closed to traffic from 9:00 AM and 3:30 PM.
  • Estimated Completion: Late May
Links

Interactive Traffic
Information Map

TxDOT Progress Reports

Contact Us

Traffic Management Center
(Signs, Markings,
and Traffic Signals)
972-744-4330
Mon-Fri 6:00-6:00

Traffic and Transportation
Engineering & Planning

411 W. Arapaho Rd., Suite 204
972-744-4320
972-744-5804 (Fax)
Mon-Fri 8:00-5:00

Last updated: 3/22/2017 2:02:33 PM